Saturday, June 18, 2011

Another Quick Update

So the upstairs looks much better now that the plaster is somewhat dried.  Downstairs is plastered.  It is like stepping into someone else's house.

Here are some more photos.

















Friday, June 17, 2011

It's A Home!

So after 9 months of destruction, demolition, worry and much work the constructions site that has been 40 M is now looking much more like a home.  Over the past two days sheetrock has gone up and the plastering has begun!  It is amazing and I must say that I am beyond excited.

Here are some pics. Sadly I did not get pictures of upstairs in the bare sheetrock  but I was able to capture the beginning of the process downstairs.

Downstairs Living Room

Looking from the corner of the downstairs living room toward bathroom and hall.

Looking into the laundry room.

Laundry Room

Laundry room

Front Bedroom


Front Bedroom

Downstairs Closset

Ocean View Bedroom

Looking into living room

Stairs leading upstairs from living room

Here is where the first step of the plastering begins.  I believe this is the initial skim coat and another coat will be added. (I hope)


Working area of kitchen.  

Eat In section of the Kitchen


Living room

Master Bedroom

Master Bedroom

Master Bedroom


Stair well leading downstairs.


I am anticipating that all the sheetrock and plastering will be completed by the end of the weekend and I'll be painting by early next week.   Our kitchen is ready to be delivered so hopefully while I'm in DC with my sisters and n the kitchen will go in.  The ball is really rolling now.  

Peace!

Wednesday, June 8, 2011

Progress Yet Again!

Well for the past month things at 40 M had stalled.  We were under the assumption that we needed to get a rough framing inspection before moving forward with the insulation.  In order to get the inspection we needed to re build the front deck and steps going into the house.  This small project ended up taking on a life of it's own.  Three carpenters later and we now have stairs and a way to get into the house.

Before






After




So here comes the comical part of this story.  Once the deck was 95% finished we called the town to schedule our inspection.  It turns out that when the inspector came to just check things out in February he put us in the computer as passed move on to insulation!  Can you believe it?   We could have been done with everything had we know we had the green light!  Oh well everything happens for a reason.

This week the insulation has been installed by a professional insulation company.  Tomorrow will be their third and last day working on the insulation.  We went over to check out the new updates and were amazed.  The house now has some interior structure.  It is no longer an open shell.  I am beyond thrilled with this new progress.  R will be calling tomorrow for our insulation inspection and we could very possibly have real walls up and plastered by the end of next week.  Yippee!!!!!

Here is what the insulation looks like right now.
Kitchen & Front Door

Eat In Area of Kitchen

Ceiling in Living Room

Master Bedroom

Second Bedroom in Basement

Second Bedroom in Basement

Third Bedroom w/Ocean Views

Stairs

Large Closet in Living Room

Kitchen

Master


It's all very exciting.  Looking forward to choosing paint colors and getting to work.

Peace!